Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2428 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,861 | $7,620 | n/a |
KS2428 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,084 | $38,536 | n/a |
KS2428 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,586 | $516 | n/a |
KS2428 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,696 | $48,503 | n/a |
KS2428 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,046 | $90 | n/a |
KS2428 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,393 | $5,480 | n/a |
KS2428 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,912 | $453,376 | n/a |
KS2425 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $297 | $1,930 | n/a |
KS2425 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM THICKNESS INSULATION | $4,756 | $1,620 | n/a |
KS2425 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,253 | $30,124 | n/a |
KS2425 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,321 | $6,963 | n/a |
KS2425 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $39,797 | $360,640 | n/a |
GT0679 # 04 Y:1999 | 04 | 1999 | INSULATE FEEDWATER TANK | $4,877 | $5,350 | Implemented |
GT0679 # 01 Y:1999 | 01 | 1999 | COMBINE UTILITY METERS | $1,400 | $0 | Not Implemented |
GT0679 # 02 Y:1999 | 02 | 1999 | CONVERT COMBUSTION EQUIPMENT TO BURN OIL | $27,261 | $5,000 | Not Implemented |
GT0679 # 03 Y:1999 | 03 | 1999 | REPAIR AND ELIMINATE STEAM LEAKS | $1,157 | $200 | Implemented |
GT0679 # 05 Y:1999 | 05 | 1999 | CLOSE OFF UNNEEDED STEAM LINES | $164 | $50 | Implemented |
GT0679 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,006 | $46,917 | Not Implemented |
GT0679 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,625 | $14,270 | Not Implemented |
GT0634 # 03 Y:1998 | 03 | 1998 | REDUCE VENTILATION AIR | $1,900 | $2,000 | Not Implemented |
GT0634 # 01 Y:1998 | 01 | 1998 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $290 | $800 | Not Implemented |
GT0634 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $1,600 | $840 | Not Implemented |
GT0634 # 04 Y:1998 | 04 | 1998 | COVER OPEN TANKS | $80 | $300 | Implemented |
GT0634 # 06 Y:1998 | 06 | 1998 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,220 | $0 | Implemented |
GT0634 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $932 | $3,180 | Implemented |