IAC logo
IAC Assessment: GT0679
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0679
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Acrylic,Latex,& Coatings
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $1,000,000-$5,000,000
# of Employees 11
Plant Area (Sq.Ft.) 45,000
Annual Production 542 Thousand Gallons
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,241 1,806,858 kWh $0.02
Electricity Demand $21,406 5,409 kW-months/year $3.96
Electricity Fees $7,183 - $ -
Natural Gas $87,374 17,364 MMBtu $5.03
TOTAL ENERGY COSTS $159,204
RECOMMENDED SAVINGS* $47,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ Tgal
01: 2.8112 COMBINE UTILITY METERS Savings:
$1,400
Cost:
-
- - - - - - - - - - $1,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$1,400
-
$
-
-
Tgal
02: 2.1333 CONVERT COMBUSTION EQUIPMENT TO BURN OIL Savings:
$27,261
Cost:
$5,000
- - - - $79,206 16,502 $(-51,945) (-16,502) - - - - - - -
-
kWh
-
-
kW-months/year
$79,206
16,502
MMBtu
$(-51,945)
(-16,502)
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,157
Cost:
$200
- - - - - - $1,130 278 - - - - $27 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,130
278
MMBtu
-
-
$
-
-
$
$27
-
Tgal
04: 2.2123 INSULATE FEEDWATER TANK Savings:
$4,877
Cost:
$5,350
- - - - - - $4,877 1,584 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,877
1,584
MMBtu
-
-
$
-
-
$
-
-
Tgal
05: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$164
Cost:
$50
- - - - - - $164 52 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$164
52
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,006
Cost:
$46,917
$4,436 184,642 $2,570 642 - - - - - - - - - - $4,436
184,642
kWh
$2,570
642
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,625
Cost:
$14,270
- - - - - - - - $5,625 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$5,625
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$47,490
Cost:
$71,787
$4,436 184,642 $2,570 642 $79,206 16,502 $(-45,774) (-14,588) $5,625 - $1,400 - $27 - $4,436
184,642
kWh
$2,570
642
kW-months/year
$79,206
16,502
MMBtu
$(-45,774)
(-14,588)
MMBtu
$5,625
-
$
$1,400
-
$
$27
-
Tgal
TOTAL IMPLEMENTED Savings:
$6,198
Cost:
$5,600
- - - - - - $6,171 1,914 - - - - $27 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,171
1,914
MMBtu
-
-
$
-
-
$
$27
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Personnel Changes Administrative Changes Water Consumption