IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0160 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,149 $200 Implemented
UM0160 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $50 Implemented
UM0160 # 03 Y:2000 03 2000 USE POWER DURING OFF-PEAK PERIODS $55,632 $22,000 Implemented
UM0160 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $2,800 $220 Implemented
UM0160 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,300 $500 Implemented
UM0160 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,600 $300 Not Implemented
CO0458 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,320 $10,000 Not Implemented
CO0458 # 02 Y:2000 02 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,970 $2,320 Not Implemented
CO0458 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,300 $1,700 Not Implemented
CO0458 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,000 $2,360 Implemented
CO0458 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $450 $270 Implemented
CO0458 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10 $0 Not Implemented
CO0458 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $120 $0 Not Implemented
CO0458 # 08 Y:2000 08 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $9,860 $500 Not Implemented
CO0458 # 09 Y:2000 09 2000 MOVE PRODUCT USING MECHANICAL MEANS $5,280 $6,720 Implemented