IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
SIC 2893 Printing Ink
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0098 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $92,987 $22,000 Implemented
DL0098 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,900 $18,000 Implemented
DL0098 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,100 $18,000 Implemented
DL0098 # 04 Y:2012 04 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,500 $19,500 Implemented
DL0098 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $4,880 Implemented
DL0098 # 06 Y:2012 06 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $700 $500 Not Implemented
UU0012 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,054 $55,276 Not Implemented
UU0012 # 02 Y:2001 02 2001 USE SYNTHETIC LUBRICANT $8,209 $250 Not Implemented
UU0012 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $8,154 $7,500 Not Implemented
UU0012 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,600 $5,000 Implemented
UU0012 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,019 $1,000 Not Implemented
MO0229 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,111,888 $0 Not Implemented
MO0229 # 02 Y:1998 02 1998 $11,035 $3,700 Not Implemented
MO0229 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,548 $7,376 Implemented
MO0229 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $1,568 Implemented
MO0229 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,899 $40 Implemented
MO0229 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,496 $52 Not Implemented
MO0229 # 07 Y:1998 07 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,484 $6,161 Implemented
MO0229 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $720 $2,080 Not Implemented
NV0084 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $840 Not Implemented
NV0084 # 02 Y:1997 02 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,562 $375 Implemented
NV0084 # 03 Y:1997 03 1997 INSTALL OCCUPANCY SENSORS $789 $410 Not Implemented
NV0084 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $258 $308 Implemented
NV0084 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $431 $1,035 Implemented
NV0084 # 06 Y:1997 06 1997 USE OPTIMUM TEMPERATURE $195 $0 Not Implemented