IAC logo
IAC Assessment: NV0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Ink
NAICS n/a
SIC 2893 - Printing Ink
Sales $10,000,000-$50,000,000
# of Employees 32
Plant Area (Sq.Ft.) 30,000
Annual Production 638,000 Pounds
Production Hrs. Annual 2,730
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,621 765,240 kWh $0.04
Electricity Demand $33,292 3,648 kW-months/year $9.13
Electricity Fees $1,338 - $ -
Natural Gas $12,139 2,427 MMBtu $5.00
TOTAL ENERGY COSTS $80,390
RECOMMENDED SAVINGS* $11,692 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,946
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,052
Cost:
$840
$1,072 24,326 $980 107 - - - - - - - - - - - - $1,072
24,326
kWh
$980
107
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,562
Cost:
$375
$816 18,464 $746 82 - - - - - - - - - - - - $816
18,464
kWh
$746
82
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$789
Cost:
$410
$500 11,430 $289 32 - - - - - - - - - - - - $500
11,430
kWh
$289
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$258
Cost:
$308
$113 2,638 $145 16 - - - - - - - - - - - - $113
2,638
kWh
$145
16
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$431
Cost:
$1,035
$431 25,498 - - - - - - - - - - - - - - $431
25,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$195
Cost:
-
- - - - $195 39 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$195
39
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
07: 2.2311 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS Savings:
$102
Cost:
-
$10 293 $7 1 $85 17 - - - - - - - - - - $10
293
kWh
$7
1
kW-months/year
$85
17
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
08: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$450
Cost:
$690
$121 2,638 $110 12 $219 44 - - - - - - - - - - $121
2,638
kWh
$110
12
kW-months/year
$219
44
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$920
Cost:
$150
$645 14,947 - - $275 55 - - - - - - - - - - $645
14,947
kWh
-
-
kW-months/year
$275
55
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
10: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$3,712
Cost:
$5,025
$(-18) (-293) - - - - - - - - $3,730 346 - - - - $(-18)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$3,730
346
gal
-
-
lb
-
-
$
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$78
Cost:
-
- - - - - - - - - - - - $78 1,950 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
$78
1,950
lb
-
-
$
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$394
Cost:
$147
- - - - - - - - - - - - - - $394 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
lb
$394
-
$
13: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$437
Cost:
$120
- - - - - - $437 240,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$437
240,000
Tgal
-
-
gal
-
-
gal
-
-
lb
-
-
$
14: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$312
Cost:
-
- - - - - - - - $312 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$312
-
gal
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,692
Cost:
$9,100
$3,690 99,941 $2,277 250 $774 155 $437 240,000 $312 - $3,730 346 $78 1,950 $394 - $3,690
99,941
kWh
$2,277
250
kW-months/year
$774
155
MMBtu
$437
240,000
Tgal
$312
-
gal
$3,730
346
gal
$78
1,950
lb
$394
-
$
TOTAL IMPLEMENTED Savings:
$3,946
Cost:
$2,675
$1,491 49,531 $1,008 111 $304 61 $437 240,000 $312 - - - - - $394 - $1,491
49,531
kWh
$1,008
111
kW-months/year
$304
61
MMBtu
$437
240,000
Tgal
$312
-
gal
-
-
gal
-
-
lb
$394
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Solid Waste (non-haz) Administrative Changes