IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2893 Printing Ink
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1064 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,630 $32,000 Not Implemented
UD1064 # 05 Y:2023 05 2023 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,632 $0 Not Implemented
UD1064 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $914 $4,215 Not Implemented
UD1064 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,422 $13,970 Not Implemented
UD1064 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Not Implemented
UD1064 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,680 $0 Not Implemented
UD0970 # 04 Y:2017 04 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,698 $2,000 Not Implemented
UD0970 # 08 Y:2017 08 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $164 $50 Not Implemented
UD0970 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $298 $1,000 Implemented
UD0970 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $1,000 Not Implemented
UD0970 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $541 $250 Implemented
UD0970 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,577 $49,400 Not Implemented
UD0970 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $142 $0 Implemented
UD0970 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $570 $0 Implemented
UD0199 # 01 Y:1986 01 1986 USE MINIMUM STEAM OPERATING PRESSURE $7,787 $20,000 Implemented
UD0199 # 07 Y:1986 07 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,778 $14,280 Implemented
UD0199 # 06 Y:1986 06 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,044 $0 Implemented
UD0199 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,004 $0 Not Implemented
UD0199 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,052 $300 Implemented
UD0199 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,090 $600 Implemented
UD0199 # 02 Y:1986 02 1986 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,568 $2,100 Implemented