IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0651 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,615 $1,485 Implemented
AM0651 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,525 $400 Implemented
AM0651 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $1,500 Implemented
AM0651 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,745 $735 Implemented
AM0651 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,725 $500 Implemented
AM0651 # 06 Y:2014 06 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,950 $0 Implemented
TA0132 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,580 $826 Implemented
TA0132 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,855 $277 Implemented
TA0005 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $31,880 $1,080 Implemented
TA0005 # 13 Y:2001 13 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,580 $826 Implemented
TA0005 # 12 Y:2001 12 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $1,855 $277 Implemented
TA0005 # 11 Y:2001 11 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,998 $0 Implemented
TA0005 # 10 Y:2001 10 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,293 $35 Implemented
TA0005 # 08 Y:2001 08 2001 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $6,882 $820 Implemented
TA0005 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $14,688 $20,194 Implemented
TA0005 # 06 Y:2001 06 2001 REDUCE EXCESS STEAM BLEEDING $14,571 $155 Implemented
TA0005 # 05 Y:2001 05 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $17,010 $0 Implemented
TA0005 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $69,313 $0 Implemented
AM0163 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $18,300 $35,000 Implemented
AM0163 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $330 $0 Implemented
AM0163 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $2,440 $1,240 Implemented