Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
735
matching recommendationsSIC | 2899 | Chemical Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0404 # 03 Y:2022 | 03 | 2022 | METER WASTE WATER | $8,108 | $1,533 | Implemented |
MI0404 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,549 | $1,660 | Not Implemented |
MI0404 # 05 Y:2022 | 05 | 2022 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,720 | $2,088 | Not Implemented |
MI0404 # 06 Y:2022 | 06 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,392 | $2,520 | Not Implemented |
AS0512 # 01 Y:2021 | 01 | 2021 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $131,005 | $500 | Implemented |
AS0512 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,545 | $9,764 | Not Implemented |
AS0512 # 03 Y:2021 | 03 | 2021 | INSTALL SKYLIGHTS | $3,915 | $15,962 | Not Implemented |
AS0512 # 04 Y:2021 | 04 | 2021 | KEEP EQUIPMENT CLEAN | $3,083 | $3,482 | Not Implemented |
AS0512 # 05 Y:2021 | 05 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,005 | $650 | Not Implemented |
AS0489 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,774 | $11,876 | Not Implemented |
AS0489 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,308 | $21,823 | Not Implemented |
AS0489 # 03 Y:2020 | 03 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,899 | $28,466 | Not Implemented |
AS0489 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $6,004 | $7,027 | Not Implemented |
AS0489 # 05 Y:2020 | 05 | 2020 | REDUCE HEAT GAIN BY WINDOW TINTING | $5,105 | $19,291 | Not Implemented |
AS0489 # 06 Y:2020 | 06 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,216 | $30 | Not Implemented |
AS0489 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $805 | $135 | Not Implemented |
AS0489 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $675 | $122 | Implemented |
AS0489 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $106 | $394 | Not Implemented |
UF0546 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,475 | $333,760 | Implemented |
UF0546 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,436 | $15,494 | Not Implemented |
UF0546 # 03 Y:2020 | 03 | 2020 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,492 | $4,295 | Implemented |
UF0546 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $2,226 | $10,638 | Not Implemented |
UF0546 # 05 Y:2020 | 05 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,023 | $60 | Not Implemented |
IC0229 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,286 | $15,316 | Implemented |
IC0229 # 05 Y:2019 | 05 | 2019 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $20,792 | $12,047 | Not Implemented |