IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0450 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,373 $3,784 Implemented
IA0450 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,207 $29,505 Implemented
IA0450 # 11 Y:2010 11 2010 OPTIMIZE PLANT POWER FACTOR $2,499 $12,951 Not Implemented
IA0450 # 10 Y:2010 10 2010 REDUCE VENTILATION AIR $4,542 $2,000 Not Implemented
IA0450 # 09 Y:2010 09 2010 METER WASTE WATER $794 $1,000 Not Implemented
IA0450 # 08 Y:2010 08 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $711 $500 Not Implemented
IA0450 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $180 $150 Implemented
IA0450 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,382 $250 Implemented
IA0450 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,496 $20 Implemented
IA0450 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,759 $660 Not Implemented
IA0450 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $888 $2,230 Implemented
KU0198 # 08 Y:1986 08 1986 INSTALL TIMERS AND/OR THERMOSTATS $562 $124 Implemented
KU0198 # 07 Y:1986 07 1986 INSTALL SET-BACK TIMERS $1,185 $60 Implemented
KU0198 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,845 $3,666 Implemented
KU0198 # 05 Y:1986 05 1986 IMPROVE LUBRICATION PRACTICES $2,456 $1,724 Implemented
KU0198 # 04 Y:1986 04 1986 USE MINIMUM STEAM OPERATING PRESSURE $2,706 $5,000 Implemented
KU0198 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,569 $0 Implemented
KU0198 # 02 Y:1986 02 1986 REPAIR AND ELIMINATE STEAM LEAKS $17,771 $880 Implemented
KU0198 # 01 Y:1986 01 1986 INCREASE AMOUNT OF CONDENSATE RETURNED $26,112 $21,000 Not Implemented
KU0076 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $380 Implemented
KU0076 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $498 $200 Implemented
KU0076 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $579 $816 Not Implemented
KU0076 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,328 $2,555 Implemented
KU0076 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,403 $2,308 Not Implemented