Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1056 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,474 $250 Implemented
UD1056 # 12 Y:2023 12 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,983 $148,109 Not Implemented
UD1056 # 11 Y:2023 11 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $228 $368 Implemented
UD1056 # 10 Y:2023 10 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,229 $0 Not Implemented
UD1056 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $7,204 $1,800 Implemented
UD1056 # 06 Y:2023 06 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,784 $0 Implemented
UD1056 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,824 $0 Implemented
UD1056 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,193 $0 Implemented
UD1056 # 05 Y:2023 05 2023 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $17,114 $3,100 Implemented
UD1056 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,573 $0 Implemented
UD1056 # 07 Y:2023 07 2023 REPAIR OR REPLACE STEAM TRAPS $7,938 $800 Implemented
UD1056 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,442 $0 Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 02 Y:2013 02 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,438 $0 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $3,141 $350 Not Implemented
UD0887 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,136 $4,000 Not Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
UD0887 # 12 Y:2013 12 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $500 $0 Not Implemented
UD0887 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $19,173 $10,000 Not Implemented
UD0887 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,244 $0 Not Implemented
UD0887 # 10 Y:2013 10 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $187 $300 Not Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented