Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2899 | Chemical Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0727 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $676 | $535 | Not Implemented |
OK0727 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $14,689 | $7,635 | Implemented |
OK0727 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $117,767 | $838,833 | Not Implemented |
OK0727 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,960 | $8,407 | Not Implemented |
OK0727 # 04 Y:2006 | 04 | 2006 | USE GRAVITY FEEDS WHEREVER POSSIBLE | $10,056 | $1,636 | Not Implemented |
OK0727 # 03 Y:2006 | 03 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,463 | $40,452 | Not Implemented |
OK0727 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,646 | $75 | Implemented |
OK0727 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,431 | $2,462 | Implemented |
OK0619 # 09 Y:2001 | 09 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,082 | $3,936 | Not Implemented |
OK0619 # 13 Y:2001 | 13 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $877 | $0 | Implemented |
OK0619 # 12 Y:2001 | 12 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $29,565 | $10,000 | Not Implemented |
OK0619 # 11 Y:2001 | 11 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,523 | $10,275 | Implemented |
OK0619 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,577 | $3,000 | Implemented |
OK0619 # 08 Y:2001 | 08 | 2001 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,200 | $1,326 | Implemented |
OK0619 # 07 Y:2001 | 07 | 2001 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $68,500 | $15,000 | Implemented |
OK0619 # 06 Y:2001 | 06 | 2001 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $38,340 | $12,500 | Not Implemented |
OK0619 # 05 Y:2001 | 05 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,191 | $1,423 | Not Implemented |
OK0619 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,184 | $200 | Implemented |
OK0619 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $816 | $878 | Not Implemented |
OK0619 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,585 | $18,400 | Not Implemented |
OK0619 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $792 | $310 | Implemented |
OK0040 # 01 Y:1982 | 01 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $3,020 | $2,680 | Implemented |
OK0040 # 04 Y:1982 | 04 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $360 | $15 | Implemented |
OK0040 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,994 | $922 | Implemented |
OK0040 # 02 Y:1982 | 02 | 1982 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $1,682 | $4,000 | Implemented |