IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0280 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,020 $0 Not Implemented
IA0280 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $845 $668 Not Implemented
IA0280 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $604 $1,592 Not Implemented
IA0280 # 05 Y:2001 05 2001 REPAIR OR REPLACE STEAM TRAPS $87,600 $7,916 Implemented
IA0280 # 06 Y:2001 06 2001 REPAIR AND ELIMINATE STEAM LEAKS $25,698 $10,330 Implemented
IA0280 # 07 Y:2001 07 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $4,493 $7,500 Not Implemented
IA0280 # 08 Y:2001 08 2001 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,473 $10,000 Not Implemented
IA0280 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,114 $0 Not Implemented
SF0226 # 10 Y:2001 10 2001 INSTALL OCCUPANCY SENSORS $1,758 $2,040 Implemented
SF0226 # 01 Y:2001 01 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,294 $0 Not Implemented
SF0226 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $726 $30 Not Implemented
SF0226 # 04 Y:2001 04 2001 OPERATE BOILERS ON HIGH FIRE SETTING $16,154 $1,260 Not Implemented
SF0226 # 05 Y:2001 05 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $35,839 $11,800 Implemented
SF0226 # 06 Y:2001 06 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $844 $535 Implemented
SF0226 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,016 $3,275 Implemented
SF0226 # 08 Y:2001 08 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,717 $2,500 Implemented
SF0226 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,944 $14,649 n/a
SF0226 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,916 $0 Not Implemented
SF0226 # 11 Y:2001 11 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $863 $1,126 Implemented
SF0226 # 12 Y:2001 12 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,217 $8,000 Not Implemented
SF0226 # 13 Y:2001 13 2001 INSTALL OCCUPANCY SENSORS $8,563 $24,267 Not Implemented
SF0226 # 14 Y:2001 14 2001 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $9,549 $15,524 Not Implemented
LL0122 # 01 Y:2001 01 2001 INSTALL SKYLIGHTS $3,305 $1,737 Not Implemented
LL0122 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $8,786 $495 Implemented
LL0122 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,898 $660 Implemented