IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2214 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,189 $270 Implemented
LS2214 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $226 $25 Not Implemented
LS2214 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $217 $38 Implemented
LS2214 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $53,187 $50,000 Implemented
LS2214 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,374 $1,394 Not Implemented
LS2214 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $63 $150 Not Implemented
AM0841 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $25,385 $3,000 Implemented
AM0841 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $4,790 $6,720 Implemented
AM0841 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,311 $0 Not Implemented
AM0841 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $598 Implemented
AM0841 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $140 $100 Implemented
AM0841 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $115 $13 Not Implemented
MA0830 # 01 Y:2022 01 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $118,337 $192,000 Not Implemented
MA0830 # 02 Y:2022 02 2022 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,790 $80,000 Not Implemented
MA0830 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $15,862 $65,410 Not Implemented
MA0830 # 04 Y:2022 04 2022 MODERATE COOLING TOWER OUTLET TEMPERATURE $9,470 $2,500 Not Implemented
MA0830 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,055 $20,800 Not Implemented
MA0830 # 06 Y:2022 06 2022 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,017 $2,500 Not Implemented
OK1048 # 01 Y:2021 01 2021 REPAIR AND ELIMINATE STEAM LEAKS $37,041 $2,860 Implemented
OK1048 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,475 $13,356 Implemented
OK1048 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,257 $3,150 Implemented
OK1048 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,153 $4,000 Not Implemented
OK1048 # 05 Y:2021 05 2021 OPTIMIZE PLANT POWER FACTOR $22,294 $15,000 Not Implemented
SD0604 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,750 $1,200 Implemented
SD0604 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,064 $0 Implemented