Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,377
matching recommendationsSIC | 29 | Petroleum And Coal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0785 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $695 | $959 | Not Implemented |
MA0785 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,893 | $20,000 | Implemented |
MA0785 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,469 | $2,569 | Not Implemented |
SF0505 # 01 Y:2017 | 01 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,294 | $4,639 | Not Implemented |
SF0505 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $86 | Not Implemented |
SF0505 # 03 Y:2017 | 03 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,070 | $1,651 | Not Implemented |
SF0505 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,325 | $6,323 | Not Implemented |
SF0505 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,816 | $6,103 | Not Implemented |
SF0505 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,675 | $28,219 | Not Implemented |
SF0505 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $3,828 | $5,423 | Implemented |
SF0505 # 08 Y:2017 | 08 | 2017 | INSULATE BARE EQUIPMENT | $1,069 | $1,882 | Implemented |
OR0685 # 01 Y:2017 | 01 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $380,108 | $83,637 | Not Implemented |
OR0685 # 02 Y:2017 | 02 | 2017 | INSULATE BARE EQUIPMENT | $90,626 | $10,470 | Not Implemented |
OR0685 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $27,005 | $27,335 | Not Implemented |
OR0685 # 04 Y:2017 | 04 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $59,155 | $90,400 | Not Implemented |
OR0685 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,442 | $2,012 | Not Implemented |
OR0685 # 06 Y:2017 | 06 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,695 | $10,499 | Not Implemented |
OR0680 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $45,000 | $66,392 | Implemented |
OR0680 # 02 Y:2017 | 02 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,852 | $150,000 | Not Implemented |
OR0680 # 03 Y:2017 | 03 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,467 | $1,000 | Implemented |
OR0680 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,732 | $3,529 | Implemented |
OR0680 # 05 Y:2017 | 05 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,714 | $13,620 | Not Implemented |
IP0071 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,630 | $1,030 | Not Implemented |
IP0071 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,868 | $5,332 | Not Implemented |
IP0071 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $2,687 | $2,183 | Not Implemented |