IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0486 # 01 Y:2001 01 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $298,800 $962,500 Not Implemented
CO0486 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $2,490 $6,000 Not Implemented
CO0486 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,140 $21,600 n/a
CO0486 # 04 Y:2001 04 2001 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $7,590 $10,000 Not Implemented
CO0486 # 03 Y:2001 03 2001 OPTIMIZE PLANT POWER FACTOR $22,640 $68,400 Not Implemented
CO0486 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $105,800 $28,000 n/a
CO0485 # 02 Y:2001 02 2001 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $59,590 $30,000 n/a
CO0485 # 10 Y:2001 10 2001 AUTOMATE FINISHING PROCESS $112,750 $100,000 Implemented
CO0485 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $2,340 Implemented
CO0485 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,680 $8,380 Implemented
CO0485 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $5,980 Implemented
CO0485 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $6,730 $23,000 Not Implemented
CO0485 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $23,640 $18,000 Implemented
CO0485 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,060 $28,000 Implemented
CO0485 # 03 Y:2001 03 2001 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $40,450 $30,000 Not Implemented
CO0485 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $229,700 $118,560 Implemented
WV0216 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $22,605 $175,000 Not Implemented
WV0216 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $167 $136 Not Implemented
WV0216 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $99 $80 Implemented
WV0216 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,413 $1,000 Implemented
WV0216 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,970 $4,460 Not Implemented
WV0216 # 08 Y:2001 08 2001 BURN WASTE OIL FOR HEAT $55,440 $10,000 Implemented
WV0216 # 10 Y:2001 10 2001 CLEAR AND RENT EXISTING SPACE $6,000 $500 Not Implemented
WV0216 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,557 $1,500 Implemented
WV0216 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,354 $75 Implemented