IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0132 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $172,243 $54,000 Implemented
NV0099 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,521 $33,286 Implemented
NV0099 # 02 Y:1998 02 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,867 $30,000 Not Implemented
NV0099 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $179 $436 Implemented
NV0099 # 04 Y:1998 04 1998 USE PHOTOCELL CONTROLS $775 $290 Not Implemented
NV0099 # 05 Y:1998 05 1998 RECOVER AND REUSE WASTE MATERIAL $-536 $0 Not Implemented
NV0098 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $215 $58 n/a
NV0098 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $768 $661 n/a
NV0098 # 03 Y:1998 03 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $9,263 $30,000 n/a
NV0098 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $289 $416 n/a
NV0098 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,645 $4,179 n/a
NV0098 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $522 $50 n/a
NV0098 # 07 Y:1998 07 1998 INSTALL TIMERS AND/OR THERMOSTATS $5,436 $175 n/a
NV0098 # 08 Y:1998 08 1998 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $477,397 $1,400,000 n/a
NV0098 # 09 Y:1998 09 1998 MINIMIZE WATER USAGE $375 $800 n/a
SF0118 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,575 $2,700 Implemented
SF0118 # 02 Y:1997 02 1997 USE PHOTOCELL CONTROLS $3,456 $2,000 Implemented
SF0118 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,464 $1,356 Implemented
SF0118 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $1,631 $2,409 Not Implemented
SF0118 # 05 Y:1997 05 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,007 $140,000 Not Implemented
SF0118 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $369 $365 Implemented
SF0118 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,770 $14,926 Implemented
SF0118 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,598 $14,138 Implemented
SF0118 # 09 Y:1997 09 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $499 $250 Implemented
SF0118 # 10 Y:1997 10 1997 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $4,583 $500 Implemented