IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 295 Asphalt Paving And Roofing Materials
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0152 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,540 $1,325,000 Implemented
DL0152 # 06 Y:2015 06 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,980 $92,000 Not Implemented
DL0152 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,400 $46,500 Not Implemented
DL0152 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,330 $164,300 Implemented
DL0152 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,290 $69,750 Implemented
DL0152 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,300 $34,100 Not Implemented
DL0152 # 01 Y:2015 01 2015 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $49,150 $85,250 Not Implemented
LE0241 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,625 $80,000 Not Implemented
LE0241 # 03 Y:2006 03 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $47,697 $40,000 Not Implemented
LE0241 # 04 Y:2006 04 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $24,673 $12,500 Not Implemented
LE0241 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,395 $2,500 Not Implemented
LE0241 # 06 Y:2006 06 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,629 $12,033 Not Implemented
LE0241 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $1,841 $500 Not Implemented
LE0241 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $306,494 $200,000 Not Implemented
WV0216 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,354 $75 Implemented
WV0216 # 10 Y:2001 10 2001 CLEAR AND RENT EXISTING SPACE $6,000 $500 Not Implemented
WV0216 # 09 Y:2001 09 2001 LEASE EQUIPMENT INSTEAD OF PURCHASING $2,250 $200 Not Implemented
WV0216 # 08 Y:2001 08 2001 BURN WASTE OIL FOR HEAT $55,440 $10,000 Implemented
WV0216 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $99 $80 Implemented
WV0216 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,557 $1,500 Implemented
WV0216 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,970 $4,460 Not Implemented
WV0216 # 03 Y:2001 03 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,413 $1,000 Implemented
WV0216 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $22,605 $175,000 Not Implemented
WV0216 # 01 Y:2001 01 2001 RECOVER WASTE HEAT FROM EQUIPMENT $167 $136 Not Implemented
HO0166 # 12 Y:1998 12 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $52,592 $500 Not Implemented