Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 295 | Asphalt Paving And Roofing Materials |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0271 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,193 | $15,000 | Not Implemented |
SF0271 # 08 Y:2003 | 08 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $56,959 | $350 | Implemented |
SF0271 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $142,307 | $525,000 | Not Implemented |
SF0271 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,167 | $8,360 | Not Implemented |
SF0271 # 09 Y:2003 | 09 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,073 | $20,578 | Not Implemented |
SF0271 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,393 | $420 | Implemented |
SF0271 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,846 | $38,640 | Implemented |
SF0271 # 03 Y:2003 | 03 | 2003 | USE PHOTOCELL CONTROLS | $2,225 | $2,760 | Implemented |
SF0271 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,964 | $567 | Implemented |
IA0326 # 02 Y:2003 | 02 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $7,772 | $1,200 | Implemented |
IA0326 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46 | $62 | Implemented |
IA0326 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $552 | Not Implemented |
IA0326 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,079 | $163 | Implemented |
IA0326 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $3,809 | $673 | Not Implemented |
IA0326 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $504 | $129 | Implemented |
IA0326 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $279 | $24 | Implemented |
IA0326 # 01 Y:2003 | 01 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,075 | $1,000 | Implemented |
IC0062 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,452 | $6,197 | Not Implemented |
IC0062 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,779 | $14,546 | Implemented |
IC0062 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,105 | $0 | Implemented |
IC0062 # 04 Y:2003 | 04 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,560 | $5,280 | Implemented |
IC0062 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $45,681 | $10,200 | Implemented |
IC0062 # 06 Y:2003 | 06 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $20,526 | $21,542 | Implemented |
IC0062 # 08 Y:2003 | 08 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $75,511 | $20,000 | Implemented |
IC0062 # 09 Y:2003 | 09 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $33,052 | $130,000 | Not Implemented |