Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2951 | Asphalt Paving Mixtures And Blocks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0253 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,889 | $20,000 | n/a |
DL0253 # 03 Y:2025 | 03 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $522 | $0 | n/a |
DL0253 # 04 Y:2025 | 04 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,070 | $7,000 | n/a |
DL0253 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,843 | $12,500 | n/a |
DL0253 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $2,662 | $3,300 | n/a |
DL0253 # 07 Y:2025 | 07 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,569 | $4,900 | n/a |
DL0253 # 08 Y:2025 | 08 | 2025 | USE OPTIMUM THICKNESS INSULATION | $17,976 | $16,320 | n/a |
DL0253 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,417 | $7,500 | n/a |
DL0253 # 10 Y:2025 | 10 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $8,030 | $55,000 | n/a |
DL0253 # 11 Y:2025 | 11 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $60,225 | $75,000 | n/a |
DL0253 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,718 | $0 | n/a |
LE0241 # 04 Y:2006 | 04 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $24,673 | $12,500 | Not Implemented |
LE0241 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $1,841 | $500 | Not Implemented |
LE0241 # 06 Y:2006 | 06 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,629 | $12,033 | Not Implemented |
LE0241 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,395 | $2,500 | Not Implemented |
LE0241 # 03 Y:2006 | 03 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $47,697 | $40,000 | Not Implemented |
LE0241 # 02 Y:2006 | 02 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $61,625 | $80,000 | Not Implemented |
LE0241 # 01 Y:2006 | 01 | 2006 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $306,494 | $200,000 | Not Implemented |
WV0216 # 01 Y:2001 | 01 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $167 | $136 | Not Implemented |
WV0216 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,605 | $175,000 | Not Implemented |
WV0216 # 03 Y:2001 | 03 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,413 | $1,000 | Implemented |
WV0216 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,970 | $4,460 | Not Implemented |
WV0216 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $15,557 | $1,500 | Implemented |
WV0216 # 06 Y:2001 | 06 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $99 | $80 | Implemented |
WV0216 # 07 Y:2001 | 07 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,354 | $75 | Implemented |