IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2992 Lubricating Oils And Greases
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1081 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $600 Implemented
OK1081 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,097 $11,114 Implemented
OK1081 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,026 $7,020 Implemented
OK1081 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,608 $0 Implemented
KU0415 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $230 $100 Implemented
KU0415 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $983 $2,255 Implemented
KU0415 # 01 Y:1993 01 1993 REPAIR AND ELIMINATE STEAM LEAKS $1,558 $150 Implemented
KU0207 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,433 $0 Implemented
KU0207 # 17 Y:1986 17 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $160 $300 Implemented
KU0207 # 16 Y:1986 16 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $128 $100 Implemented
KU0207 # 14 Y:1986 14 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $454 $20 Implemented
KU0207 # 13 Y:1986 13 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $469 $0 Implemented
KU0207 # 12 Y:1986 12 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $150 Implemented
KU0207 # 11 Y:1986 11 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $547 $0 Implemented
KU0207 # 07 Y:1986 07 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,817 $52 Implemented
KU0207 # 06 Y:1986 06 1986 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,637 $6,030 Implemented
KU0207 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $9,165 $1,494 Implemented
KU0207 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,480 $0 Implemented
KU0207 # 02 Y:1986 02 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,525 $0 Implemented
KU0104 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,312 $1,500 Implemented
KU0104 # 08 Y:1983 08 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,026 Implemented
KU0104 # 07 Y:1983 07 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,308 $132 Implemented
KU0104 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $9,791 $5,000 Implemented
KU0104 # 05 Y:1983 05 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $916 $800 Implemented
KU0104 # 04 Y:1983 04 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,624 $400 Implemented