IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0669 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,437 $0 Implemented
GT0669 # 06 Y:1999 06 1999 KEEP EQUIPMENT CLEAN $2,200 $1,000 Implemented
GT0669 # 07 Y:1999 07 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,844 $32,000 Implemented
GT0669 # 08 Y:1999 08 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $550 $200 Implemented
MA0444 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,858 $0 Implemented
MA0444 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $303 $117 Implemented
MA0444 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $322 $248 Implemented
ND0327 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,546 $25,000 Implemented
ND0327 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $744 $1,392 Implemented
ND0327 # 09 Y:1999 09 1999 MODIFY STARTUP/SHUTDOWN TIMES $16,882 $0 Implemented
ND0327 # 10 Y:1999 10 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,106 $0 Implemented
SD0234 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,069 $1,425 Implemented
HO0209 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,005 $1,600 Implemented
HO0209 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $570 Implemented
CO0442 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,620 $330 Implemented
CO0442 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $50 Implemented
SD0232 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $8,010 $11,160 Implemented
SD0232 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,708 $21,250 Implemented
SD0232 # 07 Y:1999 07 1999 INSTALL BACK-UP EQUIPMENT $1,595 $7,000 Implemented
UF0230 # 01 Y:1999 01 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,087 $50 Implemented
KU0519 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,440 $860 Implemented
KU0519 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,840 $350 Implemented
KU0519 # 05 Y:1999 05 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,490 $5,000 Implemented
KU0519 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $270 $160 Implemented
KU0519 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $84,340 $24,800 Implemented