IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,816

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0280 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $250 $0 Implemented
KU0280 # 07 Y:1989 07 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $143 $40 Implemented
RU0054 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $0 Implemented
RU0054 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,711 $8,300 Implemented
WI0047 # 01 Y:1989 01 1989 IMPROVE LUBRICATION PRACTICES $3,210 $500 Implemented
WI0047 # 02 Y:1989 02 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,901 $1,300 Implemented
WI0047 # 03 Y:1989 03 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $238 $0 Implemented
WI0047 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,913 $3,600 Implemented
WI0047 # 06 Y:1989 06 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,766 $2,100 Implemented
LT0142 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,542 $442 Implemented
LT0142 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,008 $442 Implemented
LT0142 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,470 $400 Implemented
LT0142 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,092 $200 Implemented
LT0142 # 07 Y:1989 07 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $423 $100 Implemented
LT0142 # 08 Y:1989 08 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,193 $224 Implemented
MA0142 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,859 $570 Implemented
MA0142 # 06 Y:1989 06 1989 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $27,100 $13,000 Implemented
MA0142 # 07 Y:1989 07 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $52,700 $680 Implemented
TN0357 # 01 Y:1989 01 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,000 $900 Implemented
TN0357 # 03 Y:1989 03 1989 RECOVER WASTE HEAT FROM EQUIPMENT $4,409 $1,380 Implemented
TN0357 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $3,004 $355 Implemented
TN0357 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $928 $1,110 Implemented
TN0357 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,541 $0 Implemented
TN0357 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,315 $560 Implemented
TN0357 # 09 Y:1989 09 1989 DISCONNECT BALLASTS $254 $273 Implemented