IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,816

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1054 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,142 $9,668 Implemented
UD1054 # 07 Y:2023 07 2023 DISCONNECT BALLASTS $172 $240 Implemented
UD1054 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $933 $7,594 Implemented
UD1054 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $44,209 Implemented
NL0078 # 08 Y:2023 08 2023 METER WASTE WATER $128 $250 Implemented
NL0078 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $415 Implemented
NL0078 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $658 $80 Implemented
NL0078 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $2,080 Implemented
NL0078 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $2,300 Implemented
NL0078 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,358 $17,280 Implemented
NL0078 # 01 Y:2023 01 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $31,345 $100,000 Implemented
MI0422 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,293 $580 Implemented
MI0422 # 04 Y:2023 04 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,309 $280 Implemented
MI0422 # 05 Y:2023 05 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,579 $4,001 Implemented
MI0422 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $394 $0 Implemented
TR0037 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62,708 $9,722 Implemented
TR0037 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,119 $1,204 Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
TR0040 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,084 $4,166 Implemented
TR0040 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $15,000 Implemented
IC0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,114 $7,997 Implemented
IC0276 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $83,404 $10,984 Implemented
IC0276 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $6,347 $3,405 Implemented
AM0877 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $35,600 $148,000 Implemented
AM0877 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,440 $105 Implemented