Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,915
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1069 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,796 | $300 | Implemented |
UD1069 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,461 | $952 | Implemented |
UD1069 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,894 | $1,403 | Implemented |
UD1069 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,372 | $1,389 | Implemented |
UD1069 # 08 Y:2023 | 08 | 2023 | COVER OPEN TANKS | $42 | $2,000 | Implemented |
UF0602 # 02 Y:2023 | 02 | 2023 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $389,519 | $50,482 | Implemented |
UF0602 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $339,285 | $786,250 | Implemented |
UF0602 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $268,820 | $137,250 | Implemented |
UF0602 # 07 Y:2023 | 07 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $26,608 | $0 | Implemented |
UF0602 # 08 Y:2023 | 08 | 2023 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $13,084 | $4,788 | Implemented |
UF0602 # 09 Y:2023 | 09 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $341,860 | $20,000 | Implemented |
UF0602 # 10 Y:2023 | 10 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $215,016 | $0 | Implemented |
TT0304 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $51,075 | $120 | Implemented |
TT0304 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,867 | $5 | Implemented |
TT0304 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $6,857 | $372 | Implemented |
TT0304 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $5,133 | $300 | Implemented |
TT0304 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $544 | $405 | Implemented |
TT0304 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $87 | $50 | Implemented |
WV0653 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $38,158 | $64,250 | Implemented |
WV0653 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,555 | $52,800 | Implemented |
WV0653 # 06 Y:2023 | 06 | 2023 | MINIMIZE WATER USAGE | $13,630 | $45,516 | Implemented |
WV0653 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,961 | $800 | Implemented |
WV0653 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $10,683 | $9,567 | Implemented |
WV0653 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,884 | $14,800 | Implemented |
WV0653 # 11 Y:2023 | 11 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,758 | $2,675 | Implemented |