IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0485 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,501 $4,830 Implemented
AS0485 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,573 $19,429 Implemented
AS0485 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,923 $1,064 Implemented
AS0321 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,394 $323 Implemented
AS0321 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,666 $100 Implemented
AS0321 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,990 $2,700 Implemented
AS0321 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $16,063 $4,370 Implemented
AS0318 # 04 Y:2002 04 2002 USE PLASTIC PALLETS INSTEAD OF WOOD $147,420 $166,600 Implemented
AS0318 # 06 Y:2002 06 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $516,637 $100,000 Implemented
AS0318 # 05 Y:2002 05 2002 MINIMIZE WATER USAGE $6,973 $720 Implemented
AS0318 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $155 $600 Implemented
AS0318 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,055 $2,106 Implemented
AS0318 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $4,443 $600 Implemented
AS0280 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,337 $1,066 Implemented
AS0280 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,673 $30,000 Implemented
AS0280 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,109 $12,163 Implemented
AS0280 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $287 $60 Implemented
AS0280 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $995 $378 Implemented
AS0280 # 03 Y:2000 03 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,658 $1,605 Implemented
AS0279 # 11 Y:2000 11 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $28,870 $4,880 Implemented
AS0279 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $858 $60 Implemented
AS0279 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $421 $110 Implemented
AS0276 # 11 Y:2000 11 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $44,269 $150,000 Implemented
AS0276 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,403 $140 Implemented
AS0276 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,808 $90 Implemented