Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0575 # 12 Y:2021 | 12 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,554 | $6,764 | Implemented |
SF0575 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $0 | Implemented |
SF0575 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,559 | $16,052 | Implemented |
SF0575 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,642 | $1,513 | Implemented |
SF0575 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,311 | $966 | Implemented |
SF0575 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $1,047 | Implemented |
SF0575 # 09 Y:2021 | 09 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,137 | $1,513 | Implemented |
SF0575 # 11 Y:2021 | 11 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,353 | $19,986 | Implemented |
SF0575 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,624 | $18,284 | Implemented |
AS0382 # 08 Y:2004 | 08 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $6,306 | $300 | Implemented |
AS0382 # 12 Y:2004 | 12 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,219 | $1,125 | Implemented |
AS0382 # 11 Y:2004 | 11 | 2004 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,650 | $36,448 | Implemented |
AS0382 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,540 | $3,735 | Implemented |
AS0382 # 09 Y:2004 | 09 | 2004 | INSTALL AUTOMATIC PACKING EQUIPMENT | $128,880 | $850 | Implemented |
AS0382 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $17,174 | $840 | Implemented |
AS0382 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $516 | $1,697 | Implemented |
AS0382 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,254 | $4,200 | Implemented |
AS0382 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $736 | $128,880 | Implemented |
AS0382 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $743 | $6,446 | Implemented |
AS0382 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,403 | $240 | Implemented |
AS0382 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,391 | $50 | Implemented |
AS0352 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $194 | $0 | Implemented |
AS0352 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,619 | $120 | Implemented |
AS0352 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $402 | $1,000 | Implemented |
AS0352 # 07 Y:2003 | 07 | 2003 | CLEAR AND RENT EXISTING SPACE | $12,132 | $9,260 | Implemented |