IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

542

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0236 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $868 $127 Implemented
SU0236 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,245 $713 Implemented
SU0236 # 05 Y:2006 05 2006 REPAIR OR REPLACE STEAM TRAPS $1,176 $365 Implemented
SU0236 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $220 Implemented
SU0236 # 07 Y:2006 07 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $65,227 $70,000 Implemented
SU0236 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,279 $2,517 Implemented
SU0236 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $1,314 Not Implemented
SU0236 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,858 $12,200 Implemented
SU0236 # 11 Y:2006 11 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,046 $8,856 Not Implemented
SU0236 # 12 Y:2006 12 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $288 $701 Not Implemented
MA0594 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $123,147 $15,525 Implemented
MA0594 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,354 $121,835 Implemented
MA0594 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $40,484 $141,413 Not Implemented
MA0594 # 04 Y:2006 04 2006 REPAIR OR REPLACE STEAM TRAPS $11,241 $7,665 Not Implemented
MA0594 # 05 Y:2006 05 2006 REDUCE VENTILATION AIR $5,860 $3,505 Implemented
MA0594 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,046 $0 Implemented
MA0594 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $3,159 $5,681 Not Implemented
MA0594 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,600 $500 Not Implemented
SU0185 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $95,123 $0 Not Implemented
SU0185 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $19,053 $0 Implemented
SU0185 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $345 $30 Implemented
SU0185 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,959 $92 Implemented
SU0185 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,163 $1,069 Not Implemented
SU0185 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $9,676 $30,734 Implemented
SU0168 # 01 Y:2003 01 2003 USE POWER DURING OFF-PEAK PERIODS $5,551 $0 Implemented