IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0532 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $158 Implemented
WV0532 # 09 Y:2016 09 2016 DEVELOP A REPAIR/REPLACE POLICY $806 $235 Implemented
WV0532 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $811 $0 Implemented
WV0532 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $796 $795 Implemented
WV0532 # 12 Y:2016 12 2016 UPGRADE CONTROLS ON COMPRESSORS $530 $2,500 Not Implemented
WV0532 # 13 Y:2016 13 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $25 Implemented
OR0673 # 01 Y:2016 01 2016 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $157,793 $301,613 Not Implemented
OR0673 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $102,571 $10,390 Not Implemented
OR0673 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $4,333 $229 Not Implemented
OR0673 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $5,344 Implemented
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
UD0953 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $5,190 $348 Not Implemented
UD0953 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,619 $0 Not Implemented
UD0953 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $577 $1,500 Not Implemented
UD0953 # 04 Y:2016 04 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,540 $25,000 Not Implemented
UD0953 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,677 $32,500 Not Implemented
UD0953 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $3,158 $9,400 Not Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
UD0953 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $964 $5,300 Not Implemented
UD0953 # 09 Y:2016 09 2016 IMPROVE HANDLING PRACTICES $35,646 $100,000 Not Implemented
SD0535 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $324,317 $112,783 Implemented
SD0535 # 02 Y:2016 02 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,770 $402,000 Not Implemented
SD0535 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,449 $42,926 Implemented
SD0535 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,321 $3,181 Not Implemented
SD0535 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $7,184 $6,400 Implemented