IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16,934

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 n/a
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 n/a
UD1069 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,978 $0 Implemented
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $300 Implemented
UD1069 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,461 $952 Implemented
UD1069 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $1,403 Implemented
UD1069 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $1,799 $0 Not Implemented
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 Implemented
UD1069 # 07 Y:2023 07 2023 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,914 $75,982 Not Implemented
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $2,000 Implemented
CW0129 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $10,973 $2,300 n/a
CW0129 # 02 Y:2023 02 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $21,901 $86,580 n/a
CW0129 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,343 $37,000 n/a
CW0129 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $180 n/a
CW0129 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,872 $21,000 n/a
CW0129 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,398 $72,618 n/a
TT0304 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $74,585 $185,000 Not Implemented
TT0304 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $51,075 $120 Implemented
TT0304 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $38,784 $10,000 Not Implemented
TT0304 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $12,488 $40,000 Not Implemented
TT0304 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $5 Implemented
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 Implemented
TT0304 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $5,133 $300 Implemented
TT0304 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,000 $3,000 Not Implemented
TT0304 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $405 Implemented