Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,100
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0451 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $783 | $100 | Not Implemented |
BD0451 # 09 Y:2014 | 09 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,993 | $875 | Not Implemented |
BD0451 # 10 Y:2014 | 10 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $600 | Not Implemented |
BD0451 # 11 Y:2014 | 11 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,720 | $560 | Not Implemented |
BD0451 # 12 Y:2014 | 12 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $364 | $20 | Not Implemented |
BD0451 # 13 Y:2014 | 13 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $13,000 | $2,000 | Not Implemented |
AM0671 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,810 | $18,000 | Implemented |
AM0671 # 04 Y:2014 | 04 | 2014 | USE SYNTHETIC LUBRICANT | $14,780 | $0 | Implemented |
AM0671 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,250 | $4,550 | Implemented |
AM0671 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $880 | $1,770 | Implemented |
AM0671 # 07 Y:2014 | 07 | 2014 | INSULATE BARE EQUIPMENT | $610 | $30 | Implemented |
AM0671 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $59,505 | $4,370 | Implemented |
AM0671 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,640 | $20,000 | Implemented |
IP0030 # 01 Y:2014 | 01 | 2014 | INSTALL SET-BACK TIMERS | $4,377 | $35 | Implemented |
IP0030 # 02 Y:2014 | 02 | 2014 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $5,730 | $124 | Implemented |
IP0030 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,493 | $280 | Implemented |
IP0030 # 04 Y:2014 | 04 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,369 | $746 | Not Implemented |
IP0030 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $442 | $227 | Implemented |
IP0030 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $685 | $380 | Not Implemented |
IP0030 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,951 | $1,300 | Not Implemented |
IP0030 # 08 Y:2014 | 08 | 2014 | USE PHOTOCELL CONTROLS | $406 | $1,181 | Not Implemented |
IP0030 # 09 Y:2014 | 09 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,765 | $116,486 | Not Implemented |
DL0133 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $63,690 | $134,000 | Not Implemented |
DL0133 # 02 Y:2014 | 02 | 2014 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,540 | $18,000 | Not Implemented |
DL0133 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,385 | $0 | Not Implemented |