Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0451 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $100 Not Implemented
BD0451 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,993 $875 Not Implemented
BD0451 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,470 $600 Not Implemented
BD0451 # 11 Y:2014 11 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,720 $560 Not Implemented
BD0451 # 12 Y:2014 12 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $364 $20 Not Implemented
BD0451 # 13 Y:2014 13 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $13,000 $2,000 Not Implemented
AM0671 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,810 $18,000 Implemented
AM0671 # 04 Y:2014 04 2014 USE SYNTHETIC LUBRICANT $14,780 $0 Implemented
AM0671 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,250 $4,550 Implemented
AM0671 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $880 $1,770 Implemented
AM0671 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $610 $30 Implemented
AM0671 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $59,505 $4,370 Implemented
AM0671 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,640 $20,000 Implemented
IP0030 # 01 Y:2014 01 2014 INSTALL SET-BACK TIMERS $4,377 $35 Implemented
IP0030 # 02 Y:2014 02 2014 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $5,730 $124 Implemented
IP0030 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,493 $280 Implemented
IP0030 # 04 Y:2014 04 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,369 $746 Not Implemented
IP0030 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $442 $227 Implemented
IP0030 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $685 $380 Not Implemented
IP0030 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,951 $1,300 Not Implemented
IP0030 # 08 Y:2014 08 2014 USE PHOTOCELL CONTROLS $406 $1,181 Not Implemented
IP0030 # 09 Y:2014 09 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,765 $116,486 Not Implemented
DL0133 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $63,690 $134,000 Not Implemented
DL0133 # 02 Y:2014 02 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,540 $18,000 Not Implemented
DL0133 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,385 $0 Not Implemented