IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

536

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0555 # 08 Y:1998 08 1998 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,557 $25,000 Not Implemented
OK0555 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,002 $320 Implemented
OK0555 # 10 Y:1998 10 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,823 $2,100 Implemented
OK0555 # 11 Y:1998 11 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,573 $5,000 Not Implemented
OK0555 # 12 Y:1998 12 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,948 $1,080 Not Implemented
OK0555 # 13 Y:1998 13 1998 INSTALL OCCUPANCY SENSORS $899 $585 Not Implemented
OK0539 # 01 Y:1998 01 1998 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $33,669 $117,000 Not Implemented
OK0539 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,052 $15,600 Implemented
OK0539 # 03 Y:1998 03 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,678 $5,722 Not Implemented
OK0539 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $949 $90 Not Implemented
OK0539 # 05 Y:1998 05 1998 FILTER AND REUSE HYDRAULIC OIL $6,430 $18,790 Not Implemented
OK0539 # 06 Y:1998 06 1998 METER WASTE WATER $885 $0 Not Implemented
OK0539 # 07 Y:1998 07 1998 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING $69,300 $0 Implemented
OK0539 # 08 Y:1998 08 1998 MOVE PRODUCT USING MECHANICAL MEANS $20,600 $14,000 Not Implemented
OK0504 # 01 Y:1996 01 1996 RECOVER AND REUSE WASTE MATERIAL $1,551 $800 Not Implemented
OK0504 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $16,093 $5,400 Implemented
OK0504 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $5,977 $1,952 Implemented
OK0504 # 04 Y:1996 04 1996 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,670 $6,000 Not Implemented
OK0504 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $464 $2,440 Not Implemented
OK0504 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $414 $1,875 Not Implemented
OK0502 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $874 $2,754 Implemented
OK0502 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,052 $1,843 Not Implemented
OK0502 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,241 $10,815 Not Implemented
OK0502 # 04 Y:1996 04 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,133 $0 Implemented
OK0502 # 05 Y:1996 05 1996 USE MINIMUM STEAM OPERATING PRESSURE $3,651 $0 Implemented