Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,100
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0028 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $310 | $135 | Not Implemented |
WM0028 # 04 Y:2013 | 04 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $354 | $255 | Not Implemented |
WM0028 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $656 | $3,892 | Not Implemented |
WM0028 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,111 | $0 | Implemented |
WM0028 # 07 Y:2013 | 07 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,566 | $1,034 | Not Implemented |
WM0028 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,581 | $1,410 | Not Implemented |
WM0028 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,380 | $1,790 | Not Implemented |
WM0028 # 10 Y:2013 | 10 | 2013 | RECOVER AND REUSE COOLING WATER | $41,508 | $45,500 | Not Implemented |
TT0115 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,000 | $50,000 | Implemented |
TT0115 # 02 Y:2013 | 02 | 2013 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $18,000 | $50,000 | Implemented |
TT0115 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,000 | $50,000 | Not Implemented |
TT0115 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $32,990 | $129,250 | Not Implemented |
TT0115 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $146,360 | $450,000 | Not Implemented |
TT0115 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,000 | $4,000 | Not Implemented |
TT0115 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,635 | $2,500 | Not Implemented |
TT0115 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,984 | $20,000 | Not Implemented |
TT0115 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,635 | $20,000 | Not Implemented |
OK0863 # 01 Y:2013 | 01 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,703 | $2,500 | Not Implemented |
OK0863 # 02 Y:2013 | 02 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,069 | $22,428 | Not Implemented |
OK0863 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $3,208 | $4,450 | Not Implemented |
OK0863 # 04 Y:2013 | 04 | 2013 | INSULATE BARE EQUIPMENT | $10,721 | $1,250 | Not Implemented |
CO0673 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $7,680 | $8,440 | Not Implemented |
CO0673 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,190 | $20,600 | Not Implemented |
CO0673 # 03 Y:2013 | 03 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,060 | $4,216 | Implemented |
CO0673 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,910 | $530 | Implemented |