IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,583

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0396 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,984 $280 Not Implemented
SD0396 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,283 $28,500 Implemented
SD0396 # 03 Y:2007 03 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,115 $200 Not Implemented
SD0396 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,509 $2,200 Implemented
SD0396 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $945 $1,000 Implemented
SD0395 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,816 $8,425 Implemented
SD0395 # 02 Y:2007 02 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,658 $13,350 Not Implemented
SD0395 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,155 $240 Implemented
SD0395 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,081 $1,213 Not Implemented
SD0395 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,878 $3,400 Implemented
SD0395 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $659 $1,146 Not Implemented
SD0381 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,290 $320 Implemented
SD0381 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,236 $5,650 Not Implemented
SD0381 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,237 $7,600 Not Implemented
SD0381 # 04 Y:2006 04 2006 INSTALL TIMERS AND/OR THERMOSTATS $2,044 $146 Implemented
SD0381 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,694 $2,217 Not Implemented
SD0381 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $305 $0 Implemented
LM0112 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $200 Implemented
LM0112 # 02 Y:2006 02 2006 ADJUST VENTS TO MINIMIZE ENERGY USE $19,700 $0 Not Implemented
LM0112 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $8,728 Implemented
LM0112 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $433,948 $1,000 Not Implemented
LM0112 # 05 Y:2006 05 2006 MODIFY STARTUP/SHUTDOWN TIMES $10,000 $0 Not Implemented
LM0112 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $1,348 $0 Implemented
SF0323 # 01 Y:2006 01 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,385 $4,000 Not Implemented
SF0323 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $5,614 $1,181 Not Implemented