Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16,964
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0823 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $922 | $2,975 | Implemented |
OK0823 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $5,300 | $16,148 | Implemented |
OK0823 # 05 Y:2012 | 05 | 2012 | USE HEAT PUMP FOR SPACE CONDITIONING | $139,115 | $1,292,500 | Not Implemented |
UA0076 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $7,334 | $13,455 | Not Implemented |
UA0076 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,762 | $6,195 | Not Implemented |
UA0076 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $354 | $335 | Not Implemented |
TT0090 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,085 | $0 | Not Implemented |
TT0090 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $334 | $0 | Implemented |
TT0090 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,275 | $1,000 | Implemented |
TT0090 # 04 Y:2012 | 04 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,764 | $2,000 | Implemented |
TT0090 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,008 | $1,780 | Implemented |
TT0090 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,200 | $35,000 | Not Implemented |
TT0090 # 07 Y:2012 | 07 | 2012 | OPTIMIZE PLANT POWER FACTOR | $3,800 | $7,225 | Not Implemented |
TT0090 # 08 Y:2012 | 08 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,350 | $2,400 | Implemented |
TT0090 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $134 | $525 | Implemented |
TT0090 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,004 | $54,507 | Not Implemented |
SD0444 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,992 | $100 | Implemented |
SD0444 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,090 | $1,100 | Not Implemented |
SD0444 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,113 | $272 | Implemented |
SD0444 # 04 Y:2012 | 04 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $740 | $653 | Implemented |
SD0444 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,560 | $14,000 | Not Implemented |
SD0444 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $1,892 | $3,792 | Not Implemented |
SD0444 # 07 Y:2012 | 07 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,752 | $68,368 | Not Implemented |
SD0444 # 08 Y:2012 | 08 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,873 | $20,250 | Not Implemented |
TT0086 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM THICKNESS INSULATION | $920 | $950 | Implemented |