IAC logo
IAC Assessment: SF0425
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0425
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product Polyethylene Foam
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 277,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,048
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $561,783 6,455,930 kWh $0.09
Electricity Demand $289,147 17,316 kW-months/year $16.70
Electricity Fees $16,667 - $ -
Natural Gas $79,529 10,064 MMBtu $7.90
TOTAL ENERGY COSTS $947,126
RECOMMENDED SAVINGS* $65,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,050
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$6,713
Cost:
-
$6,713 77,351 - - - - - - $6,713
77,351
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$15,421
Cost:
$7,471
$15,421 175,187 - - - - - - $15,421
175,187
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,974
Cost:
$5,906
$2,648 30,432 - - - - $2,326 294 $2,648
30,432
kWh
-
-
kW-months/year
-
-
$
$2,326
294
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,255
Cost:
$2,240
$1,255 14,425 - - - - - - $1,255
14,425
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$30,904
Cost:
$9,885
$30,904 44,862 - - - - - - $30,904
44,862
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,808
Cost:
$7,235
$1,808 16,860 - - - - - - $1,808
16,860
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,416
Cost:
$13,849
$2,344 26,931 $1,072 92 - - - - $2,344
26,931
kWh
$1,072
92
kW-months/year
-
-
$
-
-
MMBtu
08: 2.3111 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE Savings:
$692
Cost:
$2,830
- - - - $692 - - - -
-
kWh
-
-
kW-months/year
$692
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$65,183
Cost:
$49,416
$61,093 386,048 $1,072 92 $692 - $2,326 294 $61,093
386,048
kWh
$1,072
92
kW-months/year
$692
-
$
$2,326
294
MMBtu
TOTAL IMPLEMENTED Savings:
$28,050
Cost:
$31,385
$26,286 296,329 $1,072 92 $692 - - - $26,286
296,329
kWh
$1,072
92
kW-months/year
$692
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas