IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0082 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $2,500 n/a
NL0082 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $365 $1,917 n/a
NL0082 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $314 $881 n/a
MZ0345 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,065 $22,618 Implemented
MZ0345 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,154 $220 Implemented
MZ0345 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,738 $3,090 Implemented
MZ0345 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,287 $840 Implemented
MZ0345 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,404 $14,030 Implemented
MZ0345 # 06 Y:2023 06 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,711 $1,945 Implemented
MZ0345 # 07 Y:2023 07 2023 MAKE A NEW BY-PRODUCT $1,080,000 $1,350,000 Not Implemented
SJ0006 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,467 $665,395 Not Implemented
SJ0006 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,014 $7,324 Not Implemented
SJ0006 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $798 $2,977 Not Implemented
SJ0006 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,078 $7,298 Not Implemented
SJ0006 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,647 $23,000 Not Implemented
SJ0006 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,713 $4,600 Not Implemented
SJ0006 # 07 Y:2023 07 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,791 $39,456 Not Implemented
SJ0006 # 08 Y:2023 08 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $332 $1,762 Not Implemented
AS0553 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $105,557 $933,296 Not Implemented
AS0553 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,790 $7,380 Not Implemented
AS0553 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,629 $77,000 Not Implemented
AS0553 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,052 $3,786 Not Implemented
AS0553 # 05 Y:2023 05 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $708 $612 Not Implemented
AS0553 # 06 Y:2023 06 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $345 $575 Not Implemented
OK1094 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,672 $2,688 Not Implemented