IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1055 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $13,546 $36,036 Not Implemented
WM0200 # 01 Y:2023 01 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,579 $10,000 Not Implemented
WM0200 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $4,500 $12,375 Not Implemented
WM0200 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,827 $3,344 Implemented
WM0200 # 04 Y:2023 04 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,847 $800 Implemented
WM0200 # 05 Y:2023 05 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,426 $750 Implemented
WM0200 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,252 $1,288 Implemented
UD1054 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Not Implemented
UD1054 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $500 Implemented
UD1054 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $0 Not Implemented
UD1054 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $242 $500 Not Implemented
UD1054 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $11,624 $1,500 Implemented
UD1054 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,142 $9,668 Implemented
UD1054 # 07 Y:2023 07 2023 DISCONNECT BALLASTS $172 $240 Implemented
UD1054 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $933 $7,594 Implemented
UD1054 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $44,209 Implemented
UD1054 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $1,467 $7,400 Not Implemented
UD1054 # 11 Y:2023 11 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,768,755 $300,000 Not Implemented
NL0078 # 01 Y:2023 01 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $31,345 $100,000 Implemented
NL0078 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,358 $17,280 Implemented
NL0078 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $6,550 $20,000 Not Implemented
NL0078 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $2,300 Implemented
NL0078 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $2,080 Implemented
NL0078 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $658 $80 Implemented
NL0078 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $415 Implemented