Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,274
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2437 # 03 Y:2024 | 03 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $771 | $2,184 | n/a |
KS2437 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,218 | $60 | n/a |
KS2437 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,199 | $5,960 | n/a |
KS2437 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $65,208 | $627,000 | n/a |
LE0591 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,746 | $62,882 | n/a |
LE0591 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $298 | n/a |
LE0591 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,984 | n/a |
LE0591 # 04 Y:2025 | 04 | 2025 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,399 | $4,500 | n/a |
LE0591 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,438 | $3,216 | n/a |
LE0591 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $482 | $140 | n/a |
LE0591 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $27,684 | $0 | n/a |
OK1135 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,669 | $11,412 | n/a |
OK1135 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $684 | $4,416 | n/a |
OK1135 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $889 | $0 | n/a |
OK1135 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $682 | $630 | n/a |
OK1135 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,317 | $0 | n/a |
OK1135 # 06 Y:2025 | 06 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $37,433 | $57,225 | n/a |
AM0936 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $104,000 | $115,000 | n/a |
AM0936 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,000 | $644,000 | n/a |
AM0936 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $45,840 | $1,490 | n/a |
AM0936 # 04 Y:2025 | 04 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $35,490 | $397,200 | n/a |
AM0936 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,227 | $30,000 | n/a |
AM0936 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $26,345 | $418,850 | n/a |
WM0236 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,254 | $1,975 | n/a |
WM0236 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,581 | $0 | n/a |