Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0125 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,007 | $17,900 | n/a |
CW0125 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $37,427 | $1,156 | n/a |
CW0125 # 04 Y:2022 | 04 | 2022 | USE SYNTHETIC LUBRICANT | $18,816 | $9,059 | n/a |
CW0125 # 05 Y:2022 | 05 | 2022 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $23,398 | $56,000 | n/a |
CW0125 # 06 Y:2022 | 06 | 2022 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $70,112 | $8,000 | n/a |
CW0125 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,449 | $25,995 | n/a |
CW0125 # 08 Y:2022 | 08 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,307 | $41,871 | n/a |
UD1041 # 06 Y:2022 | 06 | 2022 | REDUCE VENTILATION AIR | $26,031 | $45,000 | Not Implemented |
UD1041 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,148 | $18,523 | Not Implemented |
UD1041 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,702 | $0 | Not Implemented |
UD1041 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,960 | $604 | Not Implemented |
UD1041 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,327 | $0 | Not Implemented |
UD1041 # 01 Y:2022 | 01 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,355 | $0 | Not Implemented |
UD1039 # 07 Y:2022 | 07 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,304 | $2,369 | Not Implemented |
UD1039 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $50 | Not Implemented |
UD1039 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $316 | Not Implemented |
UD1039 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $5,000 | Not Implemented |
UD1039 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $306 | $202 | Not Implemented |
UD1039 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,123 | $714 | Not Implemented |
UD1039 # 01 Y:2022 | 01 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $55 | $0 | Not Implemented |
UD1036 # 10 Y:2022 | 10 | 2022 | INSTALL OCCUPANCY SENSORS | $1,706 | $3,200 | Not Implemented |
UD1036 # 09 Y:2022 | 09 | 2022 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $40,334 | $63,686 | Not Implemented |
UD1036 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,417 | $0 | Not Implemented |
UD1036 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,509 | $20,000 | Not Implemented |
UD1036 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,062 | $0 | Not Implemented |