IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

198

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0526 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,324 $11,500 n/a
MA0526 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $3,638 $6,300 Not Implemented
MA0526 # 06 Y:2003 06 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,179 $2,970 Not Implemented
MA0526 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,169 $0 Implemented
MA0526 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $1,138 $600 Not Implemented
ME0294 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,247 $27,038 n/a
ME0294 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,038 $1,900 n/a
ME0294 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,114 $12,500 n/a
ME0294 # 04 Y:2000 04 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,247 $0 n/a
ME0294 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,416 $1,100 n/a
ME0294 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,511 $15,579 n/a
ME0294 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,742 $2,145 n/a
ME0294 # 08 Y:2000 08 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,388 $1,000 n/a
ME0294 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,982 $1,357 n/a
ME0294 # 10 Y:2000 10 2000 INSULATE BARE EQUIPMENT $708 $756 n/a
ME0294 # 11 Y:2000 11 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $9,680 $9,000 n/a
ME0294 # 12 Y:2000 12 2000 MINIMIZE WATER USAGE $260 $34 n/a
ME0294 # 13 Y:2000 13 2000 $33,752 $49,220 n/a
ME0294 # 14 Y:2000 14 2000 PAY BILLS ON TIME TO AVOID LATE FEES $5,615 $0 n/a
ME0274 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $27,426 $27,050 n/a
ME0274 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,039 $14,259 n/a
ME0274 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,786 $14,670 n/a
ME0274 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,882 $825 n/a
ME0274 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,789 $7,571 n/a
ME0274 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,182 $500 n/a