IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0171 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $737 $1,800 Not Implemented
WI0171 # 08 Y:1993 08 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $522 $375 Implemented
WI0171 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $346 $0 Implemented
HO0037 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,969 $155 Implemented
HO0037 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,247 $141 Implemented
HO0037 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,496 $5,188 Not Implemented
HO0037 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,177 $800 Not Implemented
HO0037 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,303 $2,218 Implemented
HO0037 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,005 $1,050 Not Implemented
HO0037 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,188 $1,200 Implemented
HO0037 # 08 Y:1993 08 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $0 Not Implemented
HO0037 # 09 Y:1993 09 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,898 $1,000 Implemented
SD0042 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $718 $925 Implemented
SD0042 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,484 $1,484 Not Implemented
SD0042 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,759 $20 Implemented
SD0042 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,264 $10,000 Not Implemented
SD0042 # 05 Y:1993 05 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,580 $0 Not Implemented
SD0042 # 06 Y:1993 06 1993 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $40 $39 Implemented
SD0042 # 07 Y:1993 07 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $803 $650 Implemented
SD0042 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,457 $0 Implemented
SD0042 # 09 Y:1993 09 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $10,717 $11,800 Not Implemented
SD0042 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,753 $2,420 Implemented
UD0392 # 01 Y:1993 01 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $26,912 $34,000 Not Implemented
UD0392 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,218 $0 Implemented
UD0392 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,501 $54,400 Implemented