IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,100

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0383 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,329 $13,345 Implemented
UD0383 # 06 Y:1992 06 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $15,637 $47,000 Not Implemented
ND0043 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,311 $948 Implemented
ND0043 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,269 $300 Implemented
ND0043 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $212 $3,350 Implemented
ND0043 # 04 Y:1992 04 1992 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $249 $120 Not Implemented
ND0043 # 05 Y:1992 05 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $64 $160 Implemented
KU0389 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $12,201 $0 Implemented
KU0389 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,934 $0 Not Implemented
KU0389 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $1,546 $1,000 Implemented
KU0389 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $2,964 $2,250 Implemented
KU0389 # 05 Y:1992 05 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,491 $4,158 Not Implemented
KU0389 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,077 $4,000 Not Implemented
KU0389 # 07 Y:1992 07 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $962 $0 Not Implemented
KU0389 # 08 Y:1992 08 1992 INSULATE BARE EQUIPMENT $984 $1,336 Not Implemented
KU0389 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $886 $1,050 Not Implemented
KU0389 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $120 Not Implemented
KU0389 # 11 Y:1992 11 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $602 $220 Not Implemented
MA0256 # 01 Y:1992 01 1992 REPAIR OR REPLACE STEAM TRAPS $5,378 $1 Implemented
MA0256 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $5,818 $10,368 Not Implemented
MA0256 # 03 Y:1992 03 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $4,995 $4,022 Implemented
MA0256 # 04 Y:1992 04 1992 DIRECT WARMEST AIR TO COMBUSTION INTAKE $840 $647 Not Implemented
MA0256 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $637 $1,661 Not Implemented
MA0256 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $480 $530 Implemented
MA0256 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $290 $90 Implemented