IAC Assessment: UF0070
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1993
Principal Product Plastic Closures
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 500,000,000 Pieces
Production Hrs. Annual 7,500
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $526,228 9,078,253 kWh $0.06
TOTAL ENERGY COSTS $526,228
RECOMMENDED SAVINGS* $51,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,168
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$10,702
Cost:
$15,600
$10,702 184,642 $10,702
184,642
kWh
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,866
Cost:
$2,520
$4,866 83,822 $4,866
83,822
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,941
Cost:
$8,198
$7,941 136,870 $7,941
136,870
kWh
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,961
Cost:
$6,100
$3,961 68,288 $3,961
68,288
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,113
Cost:
$2,339
$9,113 152,110 $9,113
152,110
kWh
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,406
Cost:
$6,730
$4,406 61,841 $4,406
61,841
kWh
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,008
Cost:
$128
$1,008 22,274 $1,008
22,274
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$433
Cost:
$548
$433 6,155 $433
6,155
kWh
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,413
Cost:
$14,097
$3,413 58,910 $3,413
58,910
kWh
10: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,036
Cost:
$1,025
$1,036 17,878 $1,036
17,878
kWh
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$803
Cost:
$945
$803 17,878 $803
17,878
kWh
12: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,248
Cost:
-
$3,248 - $3,248
-
kWh
13: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$515
Cost:
$1,000
$515 11,430 $515
11,430
kWh
TOTAL RECOMMENDED Savings:
$51,445
Cost:
$59,230
$51,445 822,098 $51,445
822,098
kWh
TOTAL IMPLEMENTED Savings:
$25,168
Cost:
$13,057
$25,168 372,802 $25,168
372,802
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage