IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0228 # 02 Y:1991 02 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $8,647 $5,000 Implemented
MA0228 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $2,000 Implemented
MA0228 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,585 $15,000 Not Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented
MA0197 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $406 $142 Implemented
MA0197 # 02 Y:1990 02 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,166 $642 Implemented
MA0197 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $10,622 Implemented
MA0197 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $5,052 Implemented
MA0197 # 05 Y:1990 05 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $972 $0 Implemented
MA0197 # 06 Y:1990 06 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,680 $927 Implemented
MA0197 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,639 $19,720 Not Implemented
MA0192 # 01 Y:1990 01 1990 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,182 $2,878 Not Implemented
MA0192 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $4,701 $4,950 Implemented
MA0192 # 03 Y:1990 03 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,493 $40,000 Implemented
MA0192 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,150 $0 Not Implemented
MA0192 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $1,214 $732 Implemented
MA0192 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $942 Implemented
MA0192 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $162 $436 Implemented
MA0192 # 08 Y:1990 08 1990 INSTALL TIMERS AND/OR THERMOSTATS $436 $200 Implemented
MA0184 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $518 $0 Not Implemented
MA0184 # 02 Y:1990 02 1990 REDUCE VENTILATION AIR $12,741 $3,500 Not Implemented
MA0184 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $173 $316 Not Implemented
MA0184 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $1,410 $657 Implemented
MA0184 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $5,188 $1,277 Implemented