IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0228 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $250 Implemented
CO0228 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $240 $250 Implemented
CO0228 # 06 Y:1991 06 1991 RECOVER WASTE HEAT FROM EQUIPMENT $550 $700 Implemented
CO0228 # 07 Y:1991 07 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,524 $16,400 Implemented
CO0228 # 08 Y:1991 08 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,217 $2,755 Implemented
CO0228 # 09 Y:1991 09 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,540 $7,500 Implemented
RU0131 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,853 $0 Not Implemented
RU0131 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,417 $46,695 Not Implemented
RU0131 # 03 Y:1991 03 1991 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $18,330 $0 Not Implemented
RU0127 # 01 Y:1991 01 1991 ISOLATE HOT OR COLD EQUIPMENT $2,985 $1,200 Implemented
RU0127 # 02 Y:1991 02 1991 ISOLATE HOT OR COLD EQUIPMENT $1,965 $450 Implemented
RU0127 # 03 Y:1991 03 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,708 $0 Implemented
RU0127 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,366 $830 Implemented
AS0037 # 01 Y:1991 01 1991 IMPROVE LUBRICATION PRACTICES $4,260 $0 Implemented
AS0037 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,056 $484 Implemented
AS0037 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $614 Implemented
AS0037 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,144 $1,222 Implemented
AS0037 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,795 $0 Implemented
AS0037 # 06 Y:1991 06 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,104 $180 Implemented
AS0037 # 07 Y:1991 07 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,414 $1,500 Implemented
AS0037 # 08 Y:1991 08 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,439 $44,000 Implemented
RU0128 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,552 $0 Implemented
RU0128 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $42 Implemented
RU0128 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,753 $800 Implemented
RU0128 # 04 Y:1991 04 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $2,320 $0 Implemented