IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0235 # 05 Y:2020 05 2020 APPLY FOR INVESTMENT INCENTIVES $4,581 $120 Not Implemented
TT0235 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $3,534 $9,920 Not Implemented
AM0796 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $163,700 $7,500 Not Implemented
AM0796 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $20,000 $47,510 Not Implemented
AM0796 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,300 $11,500 Not Implemented
AM0796 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,470 $30 Not Implemented
AM0796 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,880 $3,720 Not Implemented
AM0796 # 06 Y:2020 06 2020 USE SYNTHETIC LUBRICANT $1,230 $200 Not Implemented
AM0796 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $830 $150 Not Implemented
AM0796 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $590 $86 Not Implemented
LE0488 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,217 $40 Not Implemented
LE0488 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,201 $360 Implemented
LE0488 # 03 Y:2020 03 2020 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $82,690 $150,334 Implemented
LE0488 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,465 $13,000 Implemented
LE0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,995 $12,420 Implemented
LE0488 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $788 $2,200 Implemented
LE0488 # 07 Y:2020 07 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,905 $9,300 Implemented
DL0179 # 01 Y:2020 01 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,390 $2,500 Implemented
DL0179 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $7,410 $6,500 Not Implemented
DL0179 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $5,600 $600 Implemented
DL0179 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,200 $17,000 Not Implemented
DL0179 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,580 $15,000 Implemented
DL0179 # 06 Y:2020 06 2020 RECOVER WASTE HEAT FROM EQUIPMENT $26,500 $11,625 Implemented
DL0179 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,250 $13,450 Implemented
DL0179 # 08 Y:2020 08 2020 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $65,500 $47,500 Not Implemented