Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,096
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0265 # 02 Y:1988 | 02 | 1988 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $1,837 | $6,300 | Implemented |
UD0265 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $309 | $528 | Not Implemented |
LT0122 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $429 | $756 | Not Implemented |
LT0122 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,003 | $0 | Implemented |
LT0122 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,177 | $46 | Not Implemented |
LT0122 # 04 Y:1988 | 04 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $463 | $150 | Not Implemented |
UD0261 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,051 | $0 | Not Implemented |
UD0261 # 02 Y:1988 | 02 | 1988 | RECOVER AND REUSE COOLING WATER | $3,120 | $6,000 | Implemented |
UD0261 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,080 | $0 | Implemented |
UD0262 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $13,844 | $17,000 | Implemented |
UD0262 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $60 | Not Implemented |
UD0262 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,565 | $18,000 | Not Implemented |
UD0262 # 04 Y:1988 | 04 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,829 | $0 | Not Implemented |
UD0262 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $7,880 | $5,000 | Not Implemented |
WI0027 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $5,446 | $0 | Not Implemented |
WI0027 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,450 | $0 | Implemented |
WI0027 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $890 | $1,400 | Not Implemented |
WI0027 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,627 | $700 | Implemented |
WI0027 # 05 Y:1988 | 05 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $171 | $0 | Not Implemented |
WI0027 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $445 | $500 | Implemented |
RU0024 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $870 | $164 | Implemented |
RU0024 # 02 Y:1988 | 02 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $417 | $500 | Implemented |
RU0024 # 03 Y:1988 | 03 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,127 | $0 | Not Implemented |
RU0024 # 04 Y:1988 | 04 | 1988 | COVER OPEN TANKS | $410 | $200 | Implemented |
RU0024 # 05 Y:1988 | 05 | 1988 | IMPROVE LUBRICATION PRACTICES | $1,285 | $0 | Not Implemented |