IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,096

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0024 # 03 Y:1985 03 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $168 $105 Not Implemented
TS0024 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,617 $4,028 Not Implemented
TS0024 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,293 $3,000 Not Implemented
TS0024 # 06 Y:1985 06 1985 INSTALL STORM WINDOWS AND DOORS $281 $140 Not Implemented
GT0258 # 01 Y:1985 01 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,573 $2,500 Implemented
GT0258 # 02 Y:1985 02 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,450 $2,602 Implemented
GT0258 # 03 Y:1985 03 1985 REDESIGN PROCESS $45,000 $22,560 Implemented
GT0258 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,613 $6,000 Implemented
GT0258 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,943 $75 Not Implemented
GT0258 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,370 $4,472 Implemented
OK0176 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $428 $650 Implemented
OK0176 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45 $12 Implemented
OK0176 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $240 Implemented
OK0176 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $71 $145 Implemented
OK0176 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18 $60 Implemented
CO0032 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $816 $500 Not Implemented
CO0032 # 02 Y:1985 02 1985 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $816 $2,000 Implemented
CO0032 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,062 $596 Not Implemented
CO0032 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,406 $0 Not Implemented
CO0032 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,972 $3,600 Implemented
CO0032 # 06 Y:1985 06 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $596 $1,500 Implemented
CO0032 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $1,500 Implemented
OK0168 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $317 $200 Implemented
OK0168 # 02 Y:1985 02 1985 OPTIMIZE PLANT POWER FACTOR $3,024 $9,555 Not Implemented
OK0168 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $831 $140 Implemented