Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17,096
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0220 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $35,035 | $750 | Implemented |
TN0220 # 03 Y:1984 | 03 | 1984 | USE OPTIMUM THICKNESS INSULATION | $23,700 | $4,570 | Implemented |
TN0220 # 04 Y:1984 | 04 | 1984 | INSTALL SET-BACK TIMERS | $18,780 | $0 | Not Implemented |
TN0220 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $6,330 | $400 | Implemented |
TN0220 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $680 | $250 | Implemented |
TN0220 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $226 | $0 | Implemented |
MA0004 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,079 | $228 | Implemented |
MA0004 # 02 Y:1984 | 02 | 1984 | INSTALL SET-BACK TIMERS | $5,293 | $500 | Implemented |
MA0004 # 03 Y:1984 | 03 | 1984 | REDUCE VENTILATION AIR | $33,473 | $1,896 | Implemented |
MA0004 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,455 | $200 | Implemented |
TN0217 # 01 Y:1984 | 01 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $51,259 | $42,740 | Not Implemented |
TN0217 # 02 Y:1984 | 02 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,926 | $1,300 | Implemented |
TN0217 # 03 Y:1984 | 03 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $22,604 | $1,425 | Implemented |
TN0217 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,424 | $1,200 | Implemented |
TN0217 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,488 | $0 | Not Implemented |
TN0217 # 06 Y:1984 | 06 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,447 | $0 | Implemented |
TN0217 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $50 | Implemented |
MA0002 # 01 Y:1984 | 01 | 1984 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,889 | $200 | Implemented |
MA0002 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,893 | $0 | Implemented |
MA0002 # 03 Y:1984 | 03 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $13,950 | $22,000 | Not Implemented |
GT0220 # 01 Y:1984 | 01 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $590 | $1,200 | Not Implemented |
GT0220 # 02 Y:1984 | 02 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $986 | $1,840 | Implemented |
GT0220 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $4,170 | $3,000 | Implemented |
GT0220 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $301 | $640 | Implemented |
GT0220 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $76 | $150 | Implemented |