IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,405

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0156 # 09 Y:1985 09 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,230 $300 Not Implemented
OK0156 # 10 Y:1985 10 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,411 $0 Implemented
OK0156 # 11 Y:1985 11 1985 INSULATE BARE EQUIPMENT $290 $880 Implemented
OK0156 # 12 Y:1985 12 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $11,431 $0 Not Implemented
MA0015 # 01 Y:1985 01 1985 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,812 $4,280 Not Implemented
MA0015 # 02 Y:1985 02 1985 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $991 $1,035 Not Implemented
MA0015 # 03 Y:1985 03 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $36,316 $15,000 Not Implemented
MA0015 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $1,416 $4,000 Not Implemented
KU0150 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $3,365 Not Implemented
KU0150 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $993 $1,300 Not Implemented
KU0150 # 03 Y:1985 03 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $567 $0 Not Implemented
KU0150 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $749 $200 Implemented
KU0150 # 05 Y:1985 05 1985 USE COMPRESSOR AIR FILTERS $214 $0 Implemented
KU0150 # 06 Y:1985 06 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $935 $0 Not Implemented
KU0150 # 07 Y:1985 07 1985 INSTALL AUTOMATIC STACK DAMPER $761 $400 Not Implemented
KU0150 # 08 Y:1985 08 1985 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $284 $100 Implemented
KU0150 # 09 Y:1985 09 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,016 $131 Implemented
KU0150 # 10 Y:1985 10 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $835 $1,500 Not Implemented
KU0150 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $719 $265 Implemented
KU0150 # 12 Y:1985 12 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $400 Not Implemented
TS0004 # 01 Y:1984 01 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,158 $1,360 Not Implemented
TS0004 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,748 $0 Not Implemented
TS0004 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $396 $33 Not Implemented
TS0004 # 04 Y:1984 04 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,174 $42,000 Not Implemented
TS0004 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $11,480 $5,460 Not Implemented