Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,765
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0217 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,444 | $1,000 | Implemented |
UD0217 # 04 Y:1987 | 04 | 1987 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,387 | $50,000 | Not Implemented |
UD0205 # 01 Y:1986 | 01 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,692 | $708 | Implemented |
UD0205 # 02 Y:1986 | 02 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,886 | $5,000 | Implemented |
UD0205 # 03 Y:1986 | 03 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $13,480 | $52,200 | Implemented |
UD0205 # 04 Y:1986 | 04 | 1986 | INSTALL STORM WINDOWS AND DOORS | $6,617 | $6,040 | Not Implemented |
UD0205 # 05 Y:1986 | 05 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,237 | $12,000 | Implemented |
UD0205 # 06 Y:1986 | 06 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,622 | $11,000 | Implemented |
UD0206 # 01 Y:1986 | 01 | 1986 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,458 | $1,000 | Implemented |
UD0206 # 02 Y:1986 | 02 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $632 | $1,000 | Implemented |
UD0206 # 03 Y:1986 | 03 | 1986 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $11,724 | $17,000 | Implemented |
UD0192 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,234 | $2,500 | Implemented |
UD0192 # 02 Y:1986 | 02 | 1986 | REDUCE VENTILATION AIR | $4,173 | $2,500 | Implemented |
UD0174 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,998 | $0 | Not Implemented |
UD0174 # 02 Y:1985 | 02 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $323 | $583 | Implemented |
UD0174 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,825 | $1,000 | Implemented |
UD0174 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $763 | $448 | Implemented |
UD0174 # 05 Y:1985 | 05 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,290 | $5,000 | Not Implemented |
UD0174 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $457 | $121 | Implemented |
UD0151 # 01 Y:1985 | 01 | 1985 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $162 | $0 | Not Implemented |
UD0151 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $1,349 | $315 | Implemented |
UD0151 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $795 | $284 | Not Implemented |
UD0144 # 01 Y:1984 | 01 | 1984 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $104,097 | $320,000 | Implemented |
UD0147 # 01 Y:1984 | 01 | 1984 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $5,049 | $2,250 | Implemented |
UD0147 # 02 Y:1984 | 02 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $521 | $600 | Implemented |